Technical Performance Measures should be selected for those parameters that:

Answer:
  • Are expected to have the highest degree of risk
Wrong Answers:
  • Will not be addressed at technical design reviews
  • Are expected to exceed the objectives contained in the Capability Development Document (CDD)
  • Will not be subjected to formal test and evaluation. 